Marina Municipal Airport
Marina, California
Coffman Associates prepared an Environmental Assessment on a proposal to develop 25.7 acres of Marina Municipal Airport with aeronautical/mixed-use land uses. The proposed project consisted of the construction of a single-story, 580,000-square-foot steel building, which would be used for producing lightweight, all-electric vertical takeoff and landing (VTOL) aircraft. Activities proposed within the new building included manufacturing; composite fabrication; assemblage of aircraft; parts testing; and research and development. Related airport operations would include aircraft testing and integration utilizing airport taxiways and remote test areas.
Project History
Environmental Assessment 2021 | Operating Procedures Document 2020 | Initial Study 2018 | Airport Land Use Compatibility Plan 2018 | Airport Master Plan 2018